(  1055 graphs  
on   Fri Apr 04 2025 22:56:56 GMT-0400
  )
apparent age calculator
tangent point energy
Point on line equidistant to two external points
line general form explanation
{n, infinity} tiling (parametric version)
(p, infinity) poincaré tiling
tangent circles that are orthogonal to unit circle (original)
mutually tangent circles on unit circle
non planar graph arbitrarily many colors
Triangle with parallel sides
the plane is still too big
regular polygon parametric
the plane is too big
minimum clumping
diagonal wave in square
non-warped parametric stacking
evenly spaced points (constant velocity piecewise linear)
2 state quantum system - bloch sphere
phyllo heartbeat
inclusion exclusion
phyllotaxis
star
ss dd
mechanical device
arond the tra
Desmanimation 1
desmos slider
smooth floor
astra
splosh
lazy complex grid
existence of reflections implies SAS neutral geometry
conformality of circle inversion
circular inversion construction
infinite parametric line that doesn't goof off at extremely low zoom
Untitled Graph
[Copy of] circular parametric grid template
[Copy of] parametric grid template
arc length parameterizer
Primordial Fringes
worm
parabolic trig functions
ovel
globus globus domesticus
concentric polygon mapping
circular parametric grid template
better texture to plane?
bump function
complexmos nice normalization function
good complexmos functions
texture to whole plane (alternative to repeating the texture)
star ratio
division graph
smoove 2
smoove 3
smoove
grid.png
complexmos mandelbrot orbit trap
complexmos error image
hanging rope with parabola approximation
triangle clipping
complexmos settings icon (desmos is an image editor)
closest point by repeated projection onto tangent
circle collision resolution with resulting velocity
circle collision resolution
general circle inversion (without conjugation)
factoring (the last time I will ever think about this)
householder reflections
[Copy of] half plane to plane
half plane to plane
spleet ze triangle
3d with perspective (for once)
chaos - Levy C curve
hyperbolic chaos game
ali the day trip
discrete complex fourier series
area of region bounded by n tangent circles
area of regular n-gon
waggle dance of honey bees
Smoothed ReLU
Untitled Graph
corrected schwarz-christoffel mapping
sc scale curve
Untitled Graph
squish all of space into a disk
Disease Incidence Example
flip it inside out
log lens for PIMR cover
tanh lens for PIMR cover
lens the whole plane into a little disk
lens for PIMR cover
geometric roundness
Untitled Graph
vector field from parametric
magic optimizer that doesn't like saddle points and local minima
roller coaster thing
N-times differentiable bounded integral non convergent function
fractal grass - bare bones
pairwise dividers
haferman carpet
piecewise line arc length parameterization
Concentric Mapping
bad map from square to regular polygon
uniform random points in regular n-gon
Beta function using Lanczos approximation
Mobius transform in poincare disk preserving segment
Unique Mobius transformation mapping 3 points to 3 points
poincare polygon to texture coordinates
Domain coloring + Riemann Sphere + Cube Sphere
squiggly squar
rotationally symmetric hyperbolic polygon sdf
square --> disk --> p-gon --> klein model --> poincaré disk
(minimal) Map from klein to poincaré
polygon stars
inverse schwarz-christoffel : proof that it works
inverse sc
3b1b convolution thingy
schwarz-christoffel mapping
lanczos approximation (gamma function)
broken schwarz-christoffel mapping
complex lib
Map from klein to poincaré
triangulation vertex order
sampling from arbitrary probability density function (one at a time)
sampling from arbitrary probability density function
mapping the unit square to hyperbolic polygon
smoothstep
square parameterization by angle
circle intersection with parametric line through origin
circle-line through origin intersection workings
Consistent vector orientation
bernard in circle
inverse cayley map
number of outer edges
reflection edge indices
Hyperbolic library (Poincaré disk)
bijection from punctured plane to set of all lines in R2
boy's surface
axial -> beltrami-klein -> poincaré disk
euclidean to hyperbolic transform - region of definition justification
complex function visualizer
warp grid to fit quadrilateral
the funny transformation
Untitled Graph
16 tiles
loxodromic transformation : circle pairing
hexagon symmetries
riemann sphere spiral map
Cayley map on the Riemann Sphere: polar grid
Cayley map on the Riemann Sphere
interesting projective coordinate system
escher tiling
Hoberman sphere
accordion (round)
accordion (flat)
Nth degree "circles"
circumcircle arc tool
newton's fractal-adjacent thingy
x^x, complex valued
Untitled Graph
pointy square
Circle-circle intersection
Complex implicit
deterministic finite automata
coulomb's law stuff
iterating means demo for blog
Untitled Graph
tetrahedral group
dihedral group
Optimized Crane (final)
[swan] swan path generation - swan complete
[swan] optimized crane + shadows + 2 coloring schemes + basic floor
spline text for crane cover
alternative spline tool !
symmetrical alternative spline with adjustable closeness w/explanation
Xeno Graph
pendulum train limit curve!
u/thisrs thing
pendulum train
[swan] poincaré disk + circle inversion floor design
bernard metaballs
you're never gonna remember how you derived this
bernard prism
4d bernard
stereographic background effect
procedural trees take 2
regular bernard polygon
[swan] optimized swan (lerping cached paths) !!
[swan] swan path generation
[swan] trying actions :(
cube parametric
semi-transparent sphere
beer's law
besket
repeated pausing animation
Untitled Graph
Untitled Graph
amogus metaballs
fast sine approximation
braid
[Copy of] cursed floating point non-associativity
cursed floating point non-associativity
[swan] folding?
[swan] trying actions :(
sculpting with attraction and repulsion : segment
vector tools template
Segment attractor
Closest point to segment
sculpting with attraction and repulsion
Point attractor
[swan] lerp order demo
triangle implicit 3 points
mirror fold
complex valued binet formula on complex inputs
complex valued binet formula on real inputs
desmo can't plot the extension of the binet formula to all reals so ima do it myself
take the length and pUT IT ON TEH LINE
reuleaux triangle ruler/compass construction
perpendicular to line through point on line
perpendicular to line through point outside of line
it aint it but its somethin
Untitled Graph
[swan] flat pollies
[swan] base points
[Copy of] there we go
there we go
close enough
symmetrical spline thingy adapted for fad
star
Euler's method calculator for 1270
minimal average distance problem
Physics solver
inclined plane thingy
another squarametric
bernard lines
fractal tree: flower
fractal tree: square
fractal tree: bernard
gd slopes [bernard]
amogus grid except you can rotate about any point
repeat any implicit
envelope except not with lines
kaleidoscope drawing thingy
melting castle
Heart thingy from reddit
batterflie
spiky circle of mini circles: bernard
spiky circle of mini circles: square edition
spiky circle of mini circles
integrating factors solver
blobbey 2022 version
parabola of safety
circles with any alpha
derivation of circle position
spinney
honey ambigram
1d heat equation - surface
1d heat equation
mandelbrot set
stupid euler's method solver + direction field
bernstein basis polynomials
béziergon
De Casteljau's algorithm for bézier splitting
graph machine broke
shift by tangent vector
flower
convolution
P(N=5, M=[1,...,10], R=[1,...,10])
Simple falling motion with drag
Almost-Morlet Wavelet Transform (surface)
Morlet Wavelet
procedural trees
Untitled Graph
rhodes
general smooth roads
candle
wiring splines
desmo book
editable implicit shapes with ray casting
implicit closed shapes with ray casting
behold
morbius triangle
sierpinski tetrahedron
squarepinski triangle
sierpinski triangle
koch snowflake
seven circles theorem
delaunay flip method
delaunay 3d
DELAUNAY AGAIN
LED grid row parity
this is america
grid pos -> LED index conversion
Transform Mappings
improved easing
lambert
sore logo approximation
dark odyssey surface
dark odyssey
semi-implicit euler's method for solving motion equation
snap into place
shahdoe
Untitled Graph
Untitled Graph
wittie 2
wittie
cell
audio trace limit
ich bin der chicken man
mirror magic 2
magic mirrors
snail
interesting plane transformation
lighting without computing any intersections
O C T A G O N
isometric basketball animation [final]
cut and paste
fractal tree
isometric basketball animation [rev 4 - animation]
isometric basketball animation [rev 3 - hoop]
isometric basketball animation [rev 2 - bricks]
isometric basketball animation [rev 1 - basketball]
sierpinski triangle from fractal tree
adchaos locus thing
creeper golf 2
sam-lb identicon
Untitled Graph
Untitled Graph
computing sqrt(2)
twisty twisty
creeper
oddity function
3b1b pizza challenge problem
3x stellated icosahedron (1, 0.3, 0.3)
Twice stellated icosahedron (1, 0.3)
obj renderer template
icosahedron
wittgenstein's rod 6
dual of icosphere
icosphere
dual of fibonacci sphere (350 faces)
dual of fibonacci sphere for real this time
fib sphere for real this time
partial derivative visualization
fibonnacci sphere with delaunay
hanging rope
image tubes?
triangulation?
cadus investments - max additional investment calculation
Robbins Constant
tangent line designs
blobbey
nonuniform point spacing
Newton's fractal
bending square planar grid to sphere
Domain coloring + Riemann Sphere + Cube Sphere
Domain coloring + Riemann Sphere + Cube Sphere
recreation of matt henderson thing
isometric surface
don't really know what this is
derivation of adchaos's conjecture golf 1
adchaos's conjecture golf 2
gaussian blur
hype color list
adchaos's conjecture golf
wittgenstein's rod 5
wittgenstein's rod 4
wittgenstein's rod 3
wittgenstein's rod 2
wittgenstein's rod
roads
yet another method for this
lagrange polynomial cubic fit example
bezier curve template
moving center of rotation
select color by reordering expressions
cursed yellow graph
folding test 3
folding test 2
folding test
it's an elastic thingy that you can fold
mercator(inverse stereo(image))
mercator(inverse stereo)
inverse mercator projection
dumb
gd wave
wing base
kina trippy b
shading example
squeed
angery bernard running at you like a madman
angery bernard
gd slopes
Untitled Graph
giraffing calculator
stupid polygon shape fit
smooth 3d surfaces
path of least time
least time
music
mean value theorem
Untitled Graph
picture via distortion
Untitled Graph
rowtation 5 : in 3D
snowflake top
rowtation 1 : swapping
rowtation 4 : grid rotation (hinges with parametric tiles)
cursed plot
rowtation 3 : grid rotation (hinges)
rowtation 2 : maintaining order
arc length parameterization
Untitled Graph
slitscan
get splined
Pendulum painting intermediate graph: geodesic on sphere
Untitled Graph
this thing again but in 3d
stomp a turty
recreation of the thing and who posted in offtopic
bijection from Z to N
Untitled Graph
Untitled Graph
lights
explicit noise 2d
better explicit noise
explicit noise
sun and moon
mandelbrot surface, magnitude coloring
mandelbrot set (magnitude shading)
fractally shape 2
fractally shape 3
fractally shape
notebook doodle curve
lagrange polynomials but absolute valued for no reason
|x| challenge
bernard on a swing
secret to bernard implicit
animation 4
animation with respacing 3
animation with respacing 2
point distribution based on 2nd partials
respacing proof of concept
rolling block
infuriation
deceptive limit
kinda weird projection 2
kinda weird projection
Mandelbrot on sphere around viewer
amogus grid
mandelbrot set with zoom to point
mathologer vortex math
Mandelbrot set on the riemann sphere
Decimal expansion circle thingy 2
Decimal expansion circle thingy
binary searcher
Spraypainter🎨
Untitled Graph
Untitled Graph
Numberphile turtle (actions)
Numberphile turtle (parametric)
Untitled Graph
smallest number representable as a^2+b^2 where a
k-means, or something
Untitled Graph
1d normal coloring
peach
pi
pure obscenity
unit circle but wack
Untitled Graph
Recreation of "Genuary 15 - Sand"
Halley's method fractal
top notch distortion
erf(x) approximation
dice puzzle
K-D tree
Untitled Graph
Minkowski sum and difference
complex intersection between circle and line
recreation of twitter thing
implicit axolotl
[complex intersection] radius of paraboloid/plane intersection
puzzle
amogus
loading animation
[animation] iterated rotating of spiral
animation transition styles
iterated rotating of spiral
3D template
snowflakeception
Compass rose
Hyperbolic seal
packed circles along a parametric
arbitrary implicit but without rotation matrices
fanlight shading
marbles
packed circle generation (using actions)
packed circle generation (2 methods)
Untitled Graph
get gud except real time now
archacovercosinh(x)
Sphere filling with water
slonky but 3d [final version for contest]
s l o nk y
construction of product of two numbers
Untitled Graph
signed distance
Riemann Sphere
Domain coloring + Riemann Sphere
Arbitrary implicit as a surface
proof of concept for arbitrary implicit drawings [peter griffin]
proof of concept for arbitrary implicit drawings [version 2]
proof of concept for arbitrary implicit drawings
stereographic cube to sphere
Untitled Graph
4D object
interpolation between any number of functions
Reflecting about any parametric
cat cheap polygon drawing
Reflecting about a circle
Crazily powerful identity
squared harmonograph
lemon
Mega harmonographs
Harmonographs
another rounded square parameterization
Conway circle
hecent's shape
double flowers
Mathologer thing
scrolly writing with a highlighter
fan
scrolly writing 2
scrolly writing
POLYNOMIAL SPLINING
non circular gears
illegally squaring the circle
Untitled Graph
POLYNOMIAL INTERPOLATION
iteration of complex function
mandelbrot set 2
slonky but 3d [scrolling staircase]
SoME1 : Maximal Ascent
Untitled Graph
slonky but 3d [no spotlight]
slonky but 3d
polar square
Rounded square using tan(alpha) parameterization
Rounded square with smoothing integral
CLT
smoothing
Scrolling squarecase
slinky
30 degree angle construction
more spirals and loops
d e s m o
Untitled Graph
desmo
desmo
horizontal waves [desmos.png]
horizontal waves [desmos.png]
horizontal waves
horizontal waves [nate.jpg]
L_p norm
Shading with cross-hatching [iteration 4 : testing with an image]
inner product of linear combinations
grid->function->sphere->stereo
parametric grid template
jacobian thingy
spiral to surface
subspace projection
tiles
Fake desmos transform
Magnifying glass
fake desmos
Easel
Cube to sphere
Truncated Tetrahedron Stereographic projection
Real time translate and scale
Left riemann sum
eigenvectors 2x2
complex, 2
complex, 1
Untitled Graph
scrolly scrolly scrolly with a dabaranch
tracer
Shading with cross-hatching [iteration 5 : video attempt]
alternatively you can do this
Shading with cross-hatching [iteration 3 : parametric grid]
parametric form of density grid
Shading with cross-hatching [iteration 2, without the nonsense]]
Shading with cross-hatching
density distributing
turkey
Untitled Graph
Untitled Graph
kaleidoscope
spiral to filled surface
bees and bombs thingy
Circle shading
[DGAC] Fire for Igloo
[DGAC] Igloo 1
Circle shading, adaptive step size
Circle Shading 2
desmo broke
HOP IN THE WHIP
My wheels have any shape I want
Wrapping parametrics
[dog] 1
recreation of freshestcheese
Genetic Algorithm
3D boat after desmos updates
new water graph
ellipse hypotrochoids
Epitrochoids and Hypotrochoids
ellipse thingy
bettaballs
radius of curvature roller
Untitled Graph
controlable dotted lines
coordinate system
Untitled Graph
Untitled Graph
Untitled Graph
color channel curves except they're degree 6 fits and there's gamma correction
color channel curves except they're degree 6 fits
color channel curves except they're cubic fits
color channel gradient curvy wurvy thing
soulless pumpkin that stares into thine eyes
pLANE SKEWEWR except SUPER high res
pLANE SKEWEWR except high res
pLANE SKEWEWR
1/z
scalar field cross section
get gud : parametric
dot product visualization
get gud but with cylindrical coordinates
get gud : surface of revolution
coloring based on all coordinates
mental mathEMATICS
stereographic projection 2
stereographic projection
random circle walk
Untitled Graph
threat
Untitled Graph
cat
scalar line integral
Untitled Graph
best surface
i'm a brainlet
paraboloid thingy
Untitled Graph
shutter
wallis product 3b1b
path follower 2
path follower
minimum distance to graph - spinwave's suggestion
parameterization of quartic implicit
Minimum distance to graph
newton's method implicit generator REE
WIELDING THIS INEQUALITY
Newton and Halley fractal via Domain Coloring
cursed inequality
Newton and Halley fractal via Domain Coloring
Newton's method w/ticker
logloss with gradient descent
Perceptron with savestate 2
3-perceptron model
"circles" with alternative inner products
Untitled Graph
est-disp 1
3d editor concept new
Gregory-newton forward difference
wsawtooth
cursed
r e t r a c t
should be a contour plotter
Spring pendulum with rk4
Second order ODE Runge-Kutta solver for parametrics
Runge kutta solver with simulation
Untitled Graph
yeah this aint it but close enough
decomposer
volcano
line density <--> magnitude
scrumpy
flower # ten million
simple square parametric
Untitled Graph
cubic alternative spline+adjustable
symmetrical alternative spline with adjustable closeness
simplified hyperbola through three points
Hyperbola through three points
quadratic alternative spline w/adjustable closeness
smoothly connecting 2 beziers
special bezier?
bezier 2
gumdrop
gradient descent 1
surface input parametric
logloss
partial sum (900 terms)
even reciprocal partial sum
pointed
Non-circle center
Layering Flowers example
Basis change explanation
Non-radial petals
Layering flowers : second method
Perfect loop - self drawing thingy
Controlling petal tilt
SoME1 - vector scaling explanation
SoME1 : Flower generation - multiple levels
More intricate loops
Mathquill testing examples
Rotatable parametric pencil2
UC numbers
function -> design
2param loops: view all (3)
2param loops: view all (2)
2param loops: view all
ideal flower
orbit #1020394
Yet another one of these
PARABOLA FITTER
undefined
organic shapes
Rotatable parametric pencil
"Pop" color function
Locus thing ?
Parametric pretzel
Bézier surfaces
smooth curves
bézier pretzel
Continuous color map generator
testing new poly func
testing new poly func 2
Magic mapping function #2
Get gud, but complex functions this time
progression predict
Length contraction (ridiculous)
minfinder
changing some get gud
general zipping
Better Polygon
pulsing thingy
rainbow generator
visualizing noise
noise.py (noise_3)
who even knows at this point
domain coloring
color mapper
Get gud
Cloth simulation?
Irregular spline
undefined
R-->C function
GR Space transformation
Fire 2 (why is the other one so slow)
Fire
Pitt logo
List zipping
ripples in plane
Nonlinear space transformation
3D vector fields
General 3D grid
Function composition: 3D representation
nonlinear plane transformation
interference 2
why
Current through wire
A bunch of different means
refraction
buoyant force
shape I found by accident
interference
general rotated function (implicit)
Tangent line (for calculus CC)
rotated parabola (implicit)
Transforming functions
caterpillar
square wave
undefined
continued fractions in x 2
continued fractions in x
Vf
Read unlimited decimal places
Logarithmic differentiation to solve with product or quotient rules
Metaballs using new color feature
Modeling language learning
Parabolic reflector
cobra tunnel tube
about normal line
Reflecting off function
Negative n gives iterated inverse
nonlinear plane transformation
Narwhale.io data
Resonance lab
piano
All oddities map to oddity of 1 under (3x+1)/2
relation between oddity(x) and evenness(3x+1)
undefined
Getting m in terms of n
this is unsolvable
Cumulative oddity
Second oddity formula
this is unexpected to say the least
Distance from power of 2
First 1000 odd numbers
Closed form of n iterated collatz steps
eye
Costs graphs - econ
Midpoint formula (Economic Elasticity)
Rotating by greater amounts as the parametric progresses - part 2
bruv
MathGraph3D surface algorithms
Rotating by greater amounts as the parametric progresses
Times table on a circle (modular arithmetic)
Double integral substitute for f(x)^2
Fake product rule
reuleaux polygon
Variance integral
Tribonacci numbers
Yarn Ball mod
Yarn Ball
LOOPY SCOOPY
Curvature of function, general parametric
loopy scoopy
Parametric polar
Magnetism lab
RC Capacitor lab
Lame complex function contour
Goat blog
Simplifications
Poll results
Dice rolls
General grid 2
Radius of spheres
submission attempt 3
MCC challenge problem november 2019
clipping + shaded surfaces take 1
Reflection
linear transformation
Relation between derivatives and integralsd
p e n d u l u m
Group Structure on a Circle
Vector Line Integrals
MCC challenge problem november 2019
Midline test
Circles on y axis: overlap
Simplifications Continued
Circles on y axis: intersection point
Every function has a sickening jiggle
Function compressor
Goat problem
Nathaniel's team survey part 2
grid sorts
Vector valued function tangent+acceleration vector
Iterated rotation :)
Les données des paroles de 10 chansons françaises
Bix's test grading system is fundamentally flawed
Project Euler 28
time complexity
spacetime deformation
Perimeter of an ellipse. This is endlessly frustrating
pig
xkcd again
Chapter 1 CC kahoot
higher degree distance
Weaving
Weaving 2
undefined
Collatz
grid sorts
3D surface oneliner
General grid
Pressure lab
definition of limit - Calculus CC
3D with perspective and camera #2
sorting 3D points (GENERAL OCCLUSION)
Buoyancy
parametric plotter
Way v
Difference quotients
Pell
desmos drawing demo
dark mode desmos (dumb)
camera
Exclude function
undefined
nathaniels team survey
3dt2
accounting for different g
polar demo
wheel
updated contour plotter
custom sort
helpful list functions
custom sort 3
custom sort 2
custom sort
still trying to figure out general occlusion
weierstrass
smooth min/max
low quality garbage
midpoint (CHICKEN. chicken)
calm down
mmmmmmmmmmmmm idk
tiling
Fibonacci lattice and spiral
cARTESIAN to polar since i'm disabled
rectangle motion for physics simulator
undefined
Continent generation algorithm
3D with perspective and camera
direction cosines
Wavelet
Binet formula
Interesting pursuee paths to try
anybody can trace a picture with curves it's not hard
projection
Springk
Helper for boat project
Collisions
3d boat blog post
Block sliding down ramp
Torus but also just a general 3d parametric plotter
even powers of sine graphs
water from the boat thing
3D boat - global math art contest
Maybe submission
Weighted dot products on R^2
curve interpolation
Submission to the thing
Change of basis
Virus growth rate concavity test
b l o b
interesting curves
Vector Field Generator
3D T
Bijection between N^n to N^m
undefined
basketball canon physics
numerical integration
Accurate Calculator approx using Taylor series
Analytic Continuation - Natural Logarithm
SPOUNCE 2
delet this
Spounce
Double integral
Polar Double Integral
Folium of Descartes
center of mass
Definite Integral Shading
nCr exploration
Continuation of (n k)
Circle-line intersection
Hand drawn plots
Taylor Series
Contour Plotter
Generalized ellipse functions
Tangent line and normal line
complex plane rotation part 2
General ellipse parameterization
General hyperbola parameterization
Fourier
desmos graph to accompany VVf.py
edlim
Newton's method calc project
logistic "raytracing" function
exper
Rotation in the complex plane
super exponential
comp
continuous
Fourier
locus1
Gauss, erf
LISSAJOU
TS3
Attempt: FISH CIRCLES
ALTERNATIVE S1
Tay2
Parabola
y=x
cone
undefined
undefined
tr
undefined
undefined
Spinneh
phys
bridge
undefined
skewer
poop
wavy
undefined
undefined
Shapes
undefined
Cool
undefined
chicken house
Trig Ident / C
undefined
undefined
undefined
D1
e1
   
generated with
DesmosGallery